Power up your Solar incentives in NSW with Batteries
Increase your returns with PRC incentives from
your solar batteries installations in NSW
New battery incentives available from 1 November 2024
Under the Peak Demand Reduction Scheme, installers who are either installing new batteries or connecting existing batteries to a Virtual Power Plant (VPP) may be eligible to create PRCs
We are now
accredited for NSW Battery incentives
For nearly two decades, we’ve helped solar installers unlock significant financial incentives. With the new NSW battery accreditation, even greater opportunities are now available to expand your business and maximise returns.
Ready to claim battery incentives from the jump?
Estimated Returns:
Scenario 2 - 13.5 kWh battery
Battery Capacity (kWh) - 13.5
For New Battery Installations:
PRCs: 1077
Estimated return - $2,207.85
New Battery Installations connected to a VPP:
PRCs: 1240
Estimated return - $2,542.00
Scenario 4 - 28.0 kWh battery
Battery Capacity (kWh) - 28.0
For New Battery Installations:
PRCs: 2235
Estimated return - $4,581.75
New Battery Installations connected to a VPP:
PRCs: 2574
Estimated return - $5,276.70
Scenario 3 - 9.6 kWh battery
Battery Capacity (kWh) - 9.6
For New Battery Installations:
PRCs: 766
Estimated return - $1,570.30
New Battery Installations connected to a VPP:
PRCs: 882
Estimated return - $1,808.10
Scenario 1 - 10.0 kWh battery
Battery Capacity (kWh) - 10.0
For New Battery Installations:
PRCs: 798
Estimated return - $1,635.90
New Battery Installations connected to a VPP:
PRCs: 919
Estimated return - $1,883.95
Assuming Metro Sydney (1.04 Network Factor)
The returns provided are estimates and are subject to change on a daily basis. It is not guaranteed that you will receive the estimated price at the time of your transaction. Please consult with our team for more details.
Get ready to claim PRCs right out of the gate
Calculate how much you can get with PRCs
Batteries and PV: a match made in solar heaven
Why us?
Reliable People
Ready from day one and reliable in processing and compliance
Experience in complex creation scenarios
Reliable System
We are flexible – you can create just PRCs, or PRC and STC with us! We accommodate your needs
Mistake-free process - speeds up when working with an install team
Reliable Business
17 years of experience in diverse incentive schemes
Fast payment to clients paid on time every time
Eligibility Requirements
Location, Installation Type, Battery Criteria
Starting 1 November 2024, Accredited Certificate Providers (companies like us) will be able to partner with installers to create incentives for batteries. Eligibility depends on three factors:
Location
Home
Small Business
Installation Type
New battery installation
New battery installation connected to a VPP
Battery Criteria (for new installations)
2-28kWh capacity
Battery is on the CEC registered products list
Must have an existing solar system, or have solar installed concurrently with the battery
An alternative incentive option might be available if an existing battery with at least 6 years left on the warranty is connected to a VPP.
10-year minimum warranty (guaranteeing retention of a minimum of 70% of useable capacity)
The customer has paid a minimum of $200
Registered on the DER register
A smoke alarm must be installed near the battery
Compliance, Requirements and Evidence
Documents
Battery Declaration
Photographic Evidence
Annotated Map
Battery Risk Assessment
Battery Signage
Swicthboard Evidence
General Requirements
-
Nomination Form
Signed by OES on or before installation date
Fact sheet attached to either Proposal or Nomination Form
-
Clearly shows the NMI
Contains full site address and account holder's name
Demonstrates annual energy consumption below upper consumption threshold - small business site only
-
Tax Invoice clearly shows:
1. The amount paid for the implementation (must be greater than $200 + GST)
2. The Name and ABN of the purchaser (if applicable)
3. The make and model of the installed system
4. The date of purchase
Payment Evidence clearly shows:
1. The amount paid for the implementation
2. When the payment was made
3. Who made the payment
-
The document must clearly show the calculation of peak reduction certificates, and the data inputs and factors applied as required for the relevant activity
Pre-Installation Requirements
-
Geo-tagged photographs showing
The exterior of the building
Existing Solar PV system
Switchboard prior to installation, demonstrating no battery is connected (and Solar PV is installed)
Post-Installation Requirements
-
Declaration:
Be completed and signed by the qualified license holder that performs or supervises the installation
Be co-signed by the customer
AS5139 Compliance Evidence Checklist must be completed and attached to the claim file
Geo-tagged photographs showing
The installed system in situ after the installation has been completed,
Close-up photo of the installed system compliance plate, showing the make and model number
Three photographs of the installer(s) (selfie) at job set-up, mid-installation and testing/compliance
If installed indoors, a photo showing the location of a compliant smoke alarm in the vicinity of the installed battery
-
Copy of the confirmation email from AEMO certifying the battery has been registered.
This document must contain;
NMI
Make and model of the battery
Equipment and Installer Requirements
-
The BESS must be on the CEC Approved Battery List with a listed usable battery capacity between 2.0kWh and 28.0kWh.
In addition, a datasheet/fact sheet published by the manufacturer must be obtained demonstrating internet connectivity and ability to be controllable by a Demand Response Aggregator. Finally, a copy of the warranty document must be produced showing:
A warranty period of at least 10 years, and at the conclusion of that 10-year period, it must be guaranteed for at least 70% of the Usable Capacity
Defined normal use conditions, being no less than an ambient temperature range of negative 10°C to 50°C and a warranted throughput of 3.65MWh per kWh of Usable Battery Capacity.
-
Installer is an Authorised Representative;
Completed NCBA's BESS1 Training Module
Active SAA Accreditation, Electrical License and other required qualifications
3.Certificate of currency and Relationship Agreement in date
Join 700+ active clients
getting paid on time every time
Make evidence collection a breeze
Let our platform do the heavy-lifting while you handle more important things
Geo - Your one-stop online claim platform
Keep your team happy and your business in the black with our easy-to-use platforms.
Onsite - Your smart installer app
Let your installation team focus on their job, not paperwork
People, not bots, supporting you at every step
Get through the early days with our help.
Ready to claim PRCs and get paid for your install?
Meet the Team
-
Tiana Bergmans
OPERATIONS TEAM LEADER - SOLAR
Tiana leads the Geo client services team, supporting clients with claims and speedy payments for water heating upgrades and solar installations.
With a Master of Environment (specialising in governance, policy and regulation) under her belt, Tiana is passionate about helping others access sustainability initiatives and improving environmental outcomes.
-
Adam Bertino
GENERAL MANAGER - COMMERCIAL
Adam has been at NCBA since 2016, working across all areas of the business including Commercial Lighting, Public Lighting and Renewable Energy certificate creation. Adam is fully versed in the state and national legislation regarding energy efficiency schemes, ensuring all avenues are considered to maximise the available returns.
-
Madalen Todd
OPERATIONS TEAM LEADER
BBus (Marketing and Finance)
Madalen Joined NCBA in 2021 as a compliance officer and site inspector. She now manages the day to day operations of the CSO team across a range of activities. Madalen ensures compliance requirements for the energy efficiency schemes are met by the team and customers receive the best service and outcomes on their projects.
-
Owen Ryan
CLIENT SERVICES MANAGER - SOLAR
Owen has been involved in STCs and LGCs for over 8 years. He was instrumental in the development of GET’s Power Stations portfolio (which now consists of over 400 sites) and is an expert in large scale and commercial solar accreditations.
-
Carol Castro
GENERAL MANAGER - OPERATIONS
M Bus, BBus, BAcc
Carolina began working at NCBA in 2017. Since then and with her experience of more than ten years oriented towards business and process risk analysis, she manages the audits and assists businesses to access the maximum financial benefits of the Australian energy efficiency schemes whilst ensuring compliance with the applicable regulations.
What else?
-
To be considered an authorised installer, you must first complete the online Battery Training Module and sign our Relationship Agreement. All installers will need to demonstrate accreditation from SAA and provide copies of an unrestricted electrical license (and other relevant qualifications such as Home Building Compensation (HBC) for works exceeding $20,000)
-
Accredited Certificate Providers (ACP) are companies like us. We make sure that installers collect the evidence/documents required to claim certificates. Then, it's our job to make sure our clients, the installers get paid for their installs.
-
We are a company who have been working with different certificate schemes for almost 2 decades with long-lasting relationship with clients.
-
Yes. Green Energy Trading will be able to create PRCs for all eligible battery installations. We'll do it through our sister company, National Carbon Bank of Australia, but this will work on the back end. If you are an existing client, your process will be similar to what you are already used to.
-
Similar to other schemes, you'll need to provide evidence such as documents and photos.
Our platform Geo will allow you to seamlessly gather all evidence for Solar PV STCs and Battery PRCs, enabling fast and reliable payments for both certificate types.
-
Yes.
-
It will depend on the battery size and if the battery is connected to a VPP or not. You can check by clicking in the button below.
-
PRCs will not reduce year on year, the deemed lifetime will stay at 15 years unless there are rule changes.
Still have unanswered questions? Speak to our team today