Battery Installation Checklist
Follow this checklist and submit the evidence needed for your payment
During Install
Required Photo evidence
1. Installers Selfies
Pre - Install photo
Mid - Install photo
Test & Commission photo
2.Battery Photos
Compliance plate
Product Serial Number(s) - Battery modules & Battery controller
Strives for excellence and takes pride in work.
Wide - angled photo showing installed battery location
After Install
Required Documents
Electricity Bill (Must list: NMI, Supply Address, Customer’s name)
Electrical Certificate of Compliance (Battery model, Date of Test, Installer’s name and license number, Install address, System owner name)
Tax Invoice (System owners name, installation address, Battery b, rand and model).
Agreements to be sent via Geo (Consumer, Installer/Designer, Retailer)
Additional Evidence
Additional Photo Evidence
Battery & Inverter signage evidence
Australian standard AS5139 specifies that appropriate signage must be displayed around the battery and mains switchboard. This includes warning signs, shutdown procedures and battery safety datasheets.
Risk Mitigation Measures
Australian standard AS5139 specifies that appropriate risk mitigation measures should be identified and applied to installations when required.
Additional Suggested Evidence
Photos
Smoke alarm photos
Risk mitigation measures
Safety Data Sheet at switchboard
ES & PV green stickers
Switchboard (post-install)
Documents
Site Map
Risk Assessment
Safety Data Sheet
Tiana Bergmans
03805 0719
James Pasinis
03805 0720
Why us?
No Need to Wait for Regulator Approval
While others make you wait 6–8 weeks, we offer payment in just 1, 5 or 20 days after submitting a valid STC claim. That means faster access to your cash – no more delays tied to regulatory approval.
A System Built for Installers
Our STC creation system is designed to free up your working capital, not hold it hostage. With tools like Geo and Geo Onsite, you stay in control of your installs, claims and cash flow from day one.
18 Years of Certificate Creation
This is new territory for many, but not for us. We’ve been at the forefront of STC creation for two decades. With regular training webinars and ongoing support, we help you maximise every eligible STC – and avoid costly mistakes.
